Opal Environmental Logo  
 
Calibration & Testing

Prior to shipment, all OPAL instruments undergo QA testing. 100 Series products are function and accuracy tested and 200 Series systems undergo test certification to the requirements of the USEPA Performance Specification #1. A copy of the PS-1 test report and certification is provided with each system.

OPAL Environmental operates under a Quality Management system equivalent to ISO 9001 and is independently audited annually. All test equipment is validated to traceable standards.

Considerable investment has been made in dedicated, purpose built test facilities to enable us to comply with PS-1 and other test certification. These facilities, most of which are not available anywhere else in the Asia Pacific region, include:

  16 metre calibration and testing track
 
  Service shop and assembly areas
click on image to enlarge click on image to enlarge

Designed for stable and accurate positioning of systems during calibration and testing. The test track is suitable for up to 16 metre span calibrations and also allows for angular testing of optical systems.

Separate workshops are available for service shop repair work and product research and development. This ensures that we can maintain high standards for manufacturing and testing at all times.

  Ambient temperature testing cabinet
 
  Training centre
click on image to enlarge click on image to enlarge

All instruments are required to undergo stability testing across specified ambient temperature ranges. A purpose designed temperature cabinet allows all OPAL instruments to undergo precise ambient test conditions from -10 to +60 DegC

OPAL distributors and customers can receive extensive training in all aspects of the use of OPAL products. The facilities include dedicated classroom, demonstration equipment, and access to all areas of manufacturing and testing. All training courses are tailored for each group, following standard formats.

Orders & Deliveries       Service Overview